Phone:+86 15868455821
Installation requirements for Jacquard Roller Blind Fabric :
1. Install the roller shutter accessories, and determine the left and right direction of the head and the vertical direction of the bead, the head can be interchanged left and right, and the head can be installed according to the owner's preference or the convenience of the home. The bead-pulling head can be rotated, corresponding to the side-mounted and top-mounted pull-ups respectively.
2. Head installation
①Comparing the roller blinds with the windows, after finding the appropriate position, mark the position of the head screw on the window frame or wall, tighten the left and right heads on the window frame or wall with screws, and fix the head without beading The rotatable module on the top is lifted.
②Place the roller blinds in the window frame, and after finding a suitable position, mark the position of the head screw on the top of the window frame, lock the left and right heads respectively on the top of the window frame with screws, and fix the beadless head screw. The rotatable module on the head lifts off.
3. Install the track
① Put the right end of the upper rail into the head with the pull bead first, and then put the left end of the upper rail into the head without the pull bead.
② Fasten the opened rotatable module and confirm that the roller shutter will not fall or move easily, then the installation is complete.
③ Gently pull down the bead curtain on the front side, and the roller shutter will automatically rise.
④ Pull down the bead curtain on the back side so that it can control the descending of the roller shutter.